Project Tracker

« Return to all projects

Project Name: Turnpike from SR 408 to SR 50

Project Website: https://floridasturnpike.com/turnpike-projects/featured-projects/widen-turnpike-pde-sr-408-to-sr-50/

Project Number: 4440071

Impacted Counties: Orange

Condemning Authority: Florida's Turnpike/FDOT

Project Description:

Florida’s Turnpike Enterprise is conducting a Project Development & Environment (PD&E) Study for widening the Turnpike from SR 408 to SR 50 in Orange County. The Turnpike currently has eight to 12 lanes within the study limits. The PD&E Study will evaluate widening the Turnpike with and without managed lanes, plus auxiliary lanes.

An Alternatives Public Information Meeting was held in August 2021. A Public Hearing is tentatively scheduled for Spring 2022. The PD&E Study is anticipated to be complete by Summer 2022.

If your property is impacted by this project, please call us toll-free at (844) 925-3144 for a free review of your case.

Links to view the proposed alternatives:

SR 50 Clermont

Avalon Road

SR 429

SR 408

SR 50 Connector

SR 408 to SR 429

Follow us on social media

[contact-form-7 id="1646" title="General Contact Form"]